{"id":144,"date":"2014-08-07T11:12:24","date_gmt":"2014-08-07T01:12:24","guid":{"rendered":"http:\/\/wp.architecture.com.au\/bim\/?page_id=144"},"modified":"2015-06-12T13:11:45","modified_gmt":"2015-06-12T03:11:45","slug":"management-plans","status":"publish","type":"page","link":"https:\/\/wp.architecture.com.au\/bim\/groups\/management-plans\/","title":{"rendered":"Management Plans"},"content":{"rendered":"<table id=\"square-corner\" width=\"100%\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td style=\"text-align: right;\" align=\"center\" valign=\"middle\"><\/td>\n<td style=\"text-align: right;\"><a href=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/P_All_Documents1.pdf\">download all documents from this group<\/a><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" width=\"20%\"><img decoding=\"async\" class=\"size-full wp-image-148 aligncenter\" title=\"\" alt=\"p\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/p.jpg\" width=\"80\" height=\"80\" \/><\/td>\n<td width=\"80%\"><strong><a href=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/P-BIM-Management-Plans.pdf\">P &#8211; BIM Management Plans<\/a><\/strong><br \/>\nPreface, Chair BIM Management Plans Working Group (Chris Needham)<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" align=\"center\" valign=\"middle\"><img decoding=\"async\" class=\"alignnone size-full wp-image-149\" alt=\"p1\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/p1.jpg\" width=\"80\" height=\"80\" \/><\/td>\n<td><strong><a href=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/P1-What-is-a-BIM-Management-Plan-and-why-should-we-use-one.pdf\">P1 &#8211; What is a BIM Management Plan, and why should we use one?<\/a><\/strong><br \/>\nA BIM Management Plan sets out who will do what, when, how and why, to achieve the project\u2019s goals. It details who, what, when, how and why with respect to BIM\u2010based project delivery. Under most current procurement methods, the BIM Management Plan is prepared <em>after <\/em>project contributors have been formally appointed.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\"><img decoding=\"async\" class=\"alignnone size-full wp-image-150\" title=\"\" alt=\"p2\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/p2.jpg\" width=\"80\" height=\"80\" \/><\/td>\n<td><strong><a href=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/P2-What-should-be-addressed-within-a-BIM-Management-Plan.pdf\">P2 &#8211; What should be addressed within a BIM Management Plan?<\/a><\/strong><br \/>\nThe BIM Management Plan addresses how all the key elements of a project \u2013 people, program, tools, processes and protocols \u2013 will be organised and managed to achieve the project goals. The particulars must respond to the client requirements, project needs, team capacity\/skill\/expertise, procurement method, and other project\u2010specific circumstances.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-151\" alt=\"p3\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/p3.jpg\" width=\"80\" height=\"80\" \/><\/td>\n<td><strong><a href=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/08\/P3-How-should-you-prepare-and-apply-a-BIM-Management-Plan.pdf\">P3 &#8211; How should you prepare and apply a BIM Management Plan?<\/a><\/strong><br \/>\nThe process of preparing and applying a BIM Management Plan is as important as the Plan itself. No one person can single\u2010handedly know all the needs of the project for its entire lifecycle (and on the first attempt). Neither can they determine all of the appropriate measures to meet them. A collaborative and iterative approach is necessary.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>download all documents from this group P &#8211; BIM Management Plans Preface, Chair BIM Management Plans Working Group (Chris Needham) P1 &#8211; What is a BIM Management Plan, and why should we use one? A BIM Management Plan sets out who will do what, when, how and why, to achieve the project\u2019s goals. It details&#8230;<\/p>\n","protected":false},"author":338,"featured_media":0,"parent":7,"menu_order":1,"comment_status":"open","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-144","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages\/144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/users\/338"}],"replies":[{"embeddable":true,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/comments?post=144"}],"version-history":[{"count":9,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages\/144\/revisions"}],"predecessor-version":[{"id":230,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages\/144\/revisions\/230"}],"up":[{"embeddable":true,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages\/7"}],"wp:attachment":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/media?parent=144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}