{"id":7,"date":"2014-07-30T14:49:44","date_gmt":"2014-07-30T04:49:44","guid":{"rendered":"http:\/\/wp.architecture.com.au\/bim\/?page_id=7"},"modified":"2017-11-17T15:52:37","modified_gmt":"2017-11-17T04:52:37","slug":"groups","status":"publish","type":"page","link":"https:\/\/wp.architecture.com.au\/bim\/groups\/","title":{"rendered":"Working Group Publications"},"content":{"rendered":"<table id=\"square-corner\" border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<th colspan=\"2\">Steering Group<\/th>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\" align=\"center\" valign=\"middle\" width=\"20%\"><img decoding=\"async\" class=\"size-full wp-image-55 aligncenter\" title=\"\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/07\/bim.jpg\" alt=\"bim\" width=\"80\" height=\"80\" \/><\/td>\n<td width=\"80%\">\n<h4><a href=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/07\/BIM-Introduction.pdf\">BIM &amp; IPD STEERING GROUP<\/a><\/h4>\n<p>The BIM &amp; IPD Steering Group was founded in mid-2011 to form and give direction to the Working Groups. The document contained in this section provides an introduction to their effort.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table id=\"square-corner\" border=\"0\" width=\"100%\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<th colspan=\"2\">Working Groups<\/th>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" align=\"center\" valign=\"middle\" width=\"20%\"><img decoding=\"async\" class=\"alignnone size-full wp-image-59\" title=\"\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/07\/bim-plans.jpg\" alt=\"bim-plans\" width=\"80\" height=\"80\" \/><\/td>\n<td width=\"80%\"><strong>BIM MANAGEMENT PLANS<\/strong><br \/>\nWhile there are several well-written (and detailed) BIM Planning Guides and templates already in circulation, this Working Group set out to raise awareness in the local industry of the importance of BIM Management Plans and to provide practical introductory guidance on the topic.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\" align=\"center\" valign=\"middle\"><img decoding=\"async\" class=\"alignnone size-full wp-image-57\" title=\"\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/07\/bim-legal.jpg\" alt=\"bim-legal\" width=\"80\" height=\"80\" \/><\/td>\n<td><strong>BIM, LEGAL &amp; PROCUREMENT<\/strong><br \/>\nThe Legal and Procurement Strategy Group aims at producing short and easily comprehensible industry papers that benefit architects, engineers, contractors, the QS, and the client.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-56\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/07\/bim-education.jpg\" alt=\"bim-education\" width=\"80\" height=\"80\" \/><\/td>\n<td><strong>BIM EDUCATION<\/strong><br \/>\nThe BIM Education Working Group set out to investigate how to address the topic of BIM Education (or BIM <em>in<\/em> Education) within industry and academia.<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-58\" src=\"http:\/\/wp.architecture.com.au\/bim\/wp-content\/uploads\/sites\/40\/2014\/07\/bim-outreach.jpg\" alt=\"bim-outreach\" width=\"80\" height=\"80\" \/><\/td>\n<td><strong>BIM OUTREACH<\/strong><br \/>\nThe aim of the Outreach group is to explain in clear language, from a practitioner\u2019s point of view, some of the benefits, issues, costs and hurdles when implementing a BIM methodology into your business and projects.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Steering Group BIM &amp; IPD STEERING GROUP The BIM &amp; IPD Steering Group was founded in mid-2011 to form and give direction to the Working Groups. The document contained in this section provides an introduction to their effort. &nbsp; Working Groups BIM MANAGEMENT PLANS While there are several well-written (and detailed) BIM Planning Guides and&#8230;<\/p>\n","protected":false},"author":338,"featured_media":0,"parent":0,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-7","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages\/7","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/users\/338"}],"replies":[{"embeddable":true,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/comments?post=7"}],"version-history":[{"count":22,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages\/7\/revisions"}],"predecessor-version":[{"id":365,"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/pages\/7\/revisions\/365"}],"wp:attachment":[{"href":"https:\/\/wp.architecture.com.au\/bim\/wp-json\/wp\/v2\/media?parent=7"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}